ACTIONCUSH I
PART 1 - GENERAL
1.01 Description
A.
The information herein details a low profile
cushioned system comprised of two layers of
plywood crossed and fastened together with
ActionCush pads affixed to the bottom and maple
strip flooring nailed to the top.
B.
The general contractor shall provide a level,
steel troweled slab to a tolerance of + or -
1/8" (3mm) in a 10'0" (3m) radius and subject to
the approval of the wood floor contractor.
Moisture barriers must be adequate for
conditions. The concrete slab is to be depressed
1-3/8" (35mm) plus the thickness of the flooring
specified.
1.02
Quality Assurance
A.
All system component parts must be supplied by
Action Floor Systems, LLC.
B.
The flooring contractor must be approved by
Action Floor Systems, LLC.
C.
Flooring materials must be allowed to acclimate
to building conditions on the jobsite in a dry,
well-ventilated area, not in contact with
masonry, and shall be installed at a moisture
content not to exceed 8% except in areas of
constant high humidity where the moisture
content of the flooring shall not exceed 10%.
1.03
Working Conditions
A.
The wood flooring shall not be installed until
all masonry, plastering, tile, marble and
terrazzo work is completed, and overhead
mechanical trades and painters have finished in
wood floor area. The building must be reasonably
dry; all openings must be closed in; permanent
heating and air conditioning installed and
operating.
B.
The subfloor shall be dry, free of foreign
materials, and turned over to the wood flooring
contractor broom clean. Moderate room
temperature of 65 degrees F (18C) or more shall
be maintained a week preceding and throughout
the duration of the work. Humidity conditions
within the building shall approximate humidity
conditions which will prevail when the building
is occupied. Care should be taken to maintain
humidity within the range of 35% to 50%.
1.04
Warranty
A.
Action Floor Systems, LLC warrants the material
it ships to be free from defects in materials
and workmanship for a period of one year and the
flooring installer warrants the installation of
the flooring to be free of defects in materials
and workmanship for a period of one year. The
exclusive remedy under this warranty shall be
replacement of defective material supplied by
Action Floor Systems, LLC or correction of
defective installation by the flooring
installer. All implied warranties of
merchantability or fitness for intended use are
limited to the period of this warranty. This
warranty excludes consequential damages.
B.
This warranty does not cover damage caused by
fire, winds, floods,chemicals or other abuse or
by failure of other contractors to adhere to
specifications or neglect of reasonable
precaution to provide adequate ventilation
during hot and humid weather. This warranty also
excludes damage due to excessive dryness or
excessive moisture from humidity, spillage,
migration through the slab or wall or any other
source. This warranty also excludes damage to
floors due to ordinary wear and tear, faulty
construction of the building, (other than the
flooring installation), separation of the
concrete slab underlying the floor, settlement
of the walls, or use of water on the floor.
C.
During the warranty period, the floor cannot be
coated without the permission of the floor
contractor.
PART
2 - PRODUCTS
2.01
Materials
A.
Flooring
1.
Flooring shall be hard maple standard strip
flooring, 25/32" x 2-1/4" (20mm x 57mm) or
1-1/2" (38mm) as manufactured by Action Floor
Systems, LLC.
2.
Grades available are MFMA 1st, 2nd&Btr, 3rd&Btr,
and 3rd grade.
3.
Action Long-Length FJ strip flooring.
B.
Subfloor
1.
Vapor barrier shall be 6-mil polyethylene.
2.
The pads shall be ActionCush 3/8" (10mm) PVC
pads with six fully enclosed air channels.
Option: ActionCush 5/8" (16mm) PVC pads.
3.
Panels shall be 15/32" x 4' x 8' (12mm x 1.2m x
2.4m) CD face, exposure 1, 4-ply rated plywood.
4.
Subfloor fasteners shall be 1" (25mm) cleats or
16-gauge staples.
5.
Flooring nails shall be 2" (50mm) cleats or
staples.
6.
Wall base shall be 3" x 4" (76mm x 102mm) vented
cove base with premolded corners (specify black
or brown), as supplied by Action Floor Systems,
LLC.
PART
3 - EXECUTION
3.01
Inspection
A.
Inspect concrete slab for proper tolerance and
dryness reporting any discrepancies in writing
to the general contractor.
B.
All work to put the concrete slab in acceptable
condition shall be the responsibility of the
general contractor.
3.02
Installation
A.
Cover concrete slab with poly lapping edges 6"
(150mm).
B.
ActionCush pads shall be attached to the
underside of the first layer of plywood 12"
(305mm) on-center.
C.
Place the first layer of plywood diagonal or
perpendicular to the intended direction of the
finish flooring.
D.
Nail or staple the second layer of plywood
without pads at a 45-degree angle or at right
angles to the first layer with 1" (25mm) staples
or nails on approximately 12" (305mm)
on-centers, minimum of 32 fasteners per sheet.
No joint in the second layer of plywood shall
coincide with a joint in the first layer. Allow
1/4" (6mm) between panels at sides and edges,
and 2" (50mm) expansion void at walls and
vertical obstructions.
E.
Machine nail strip flooring into second layer of
plywood parallel to the long dimension of the
area. Provide adequate expansion at regular
intervals across the floor during installation
as dictated by the average humidity conditions
of the area according to the recommendations of
the local Action Floor Systems, LLC flooring
contractor. Provide 2" (50mm) expansion voids at
perimeters and all vertical obstructions.
Install vent cove base over perimeter and metal
thresholds at doorways.
3.03
Floor Sanding
A.
Use coarse, medium and fine grade sandpaper.
B.
After sanding with drum sander, buff entire
floor using 100 grit screenback or equal grit
sandpaper, with a heavy-duty buffing machine.
C.
Vacuum or tack floor before first coat of
finish.
D.
Floor shall present a smooth surface without
drum stop marks, gouges, streaks or shiners.
3.04
Finishing
A.
Inspect entire area of floor to ensure that the
surface is acceptable for finishing, completely
free from sanding dust and perfectly clean.
B.
Apply seal and finish per manufacturer's
instructions.
C.
Screenback or steel wool and vacuum or tack
between each coat after it dries.
D.
Apply game lines accurately after the seal coat,
after buffing and vacuuming. Lay out in
accordance with drawings. For game lines, use
current rules of association having
jurisdiction. Lines shall be straight with sharp
edges in colors selected by the architect.
Game-line paint shall be compatible with finish.
3.05
Base Installation
A.
Affix rubber base to wall with recommended
adhesive or screws. Miter all corners carefully.
Use premolded outside corners Install aluminum
thresholds as required, anchoring firmly in
concrete floor beyond limits of wood flooring.
3.06
Clean Up
A.
Clean up all unused materials and debris and
remove from premises.
3.07
Maintenance
A.
Upon completion of floor installation, the
owners, attendants or individuals in charge and
responsible for the upkeep of the building are
to see that the care and maintenance
instructions of the MFMA are followed. Failure
to do so may void warranty.
IT IS
THE POLICY OF ACTION FLOOR SYSTEMS, LLC. TO
CONTINUOUSLY UPDATE AND IMPROVE OUR PRODUCT
LINES. THEREFORE, WE RESERVE THE RIGHT TO
CHANGE, MODIFY OR DISCONTINUE SYSTEMS,
SPECIFICATIONS AND ACCESSORIES OF ALL PRODUCTS
AT ANY TIME WITHOUT ANY NOTICE OR OBLIGATION TO
ANY PURCHASERS.
04/09 |