Case Study: St. Mary’s High School

A Canadian high school was determined not to make the same mistake twice: investing in a gymnasium floor that only lasted 15 years and was loaded with headaches. A wise choice was made (this time).

Solid Rock Basketball

The clock was ticking as an Action Floors dealer in Oklahoma worked to install a maple sports floor at a youth basketball training center. Get the full story.